Contact Us

Tel: +86-531-88923628

Mob: +86-18663704940

E-mail: manager@slbreweries.com

Add: Shanda South Road 9-2, Licheng District, Jinan City, Shandong Province

Large Brewing Plant

Common capacity: 20bbl-50bbl
Control system: whole system automatic
Power: 25kw-50kw
Weight: 3T-5T
Warranty: 5 years

InquiryChat Now

  • Product Details

Take the 30bbl large beer brewery equipment to introduce:

p1746.jpg 30bbl beer brewery system include

UNit

Components

Capacity

Milling

Miller

500KG/H

Brewhouse

Mash tank

30bbL

Lauter tank

30bbL

Boil/whirlpool

30bbL

Hot water tank

50BBL

Plate exchanger

35m2

Wort pump

8T/H*4Pieces

Fermentor

Fermentor

4 pieces*30BBL

Fermentor

2 pieces*60BBL

Hop adding device


Refrigeration unit

Chiller

25HP

Ice water tank and pump

40BBL

Cold water tank and pump

40BBL

Washing system

CIP washing

250L

Control system

Controller for mashing system

Control cabinet or PLC control

Controller for fermenting system

Control cabinet or PLC control


p1022.jpg

p0843.jpg


Mash system Effective volume:

30BBL

Mash system:Total Volume:

40BBL

Raker:

can lift and decline spent grain out automaticly

Heating way:

Steam heating

Inner-Jacket (SUS304)thickness:

3.0mm

External-Jacket (SUS304)thickness:

2.0mm

Glass manhole

375mm

The Details of the mash system

p1727.jpg

The fermentors description:


Cooling way

Dimple jacket

Cooling media

glycol water or alcohol water

unternal-Jacket(SUS304) thickness

3.0mm

External-Jacket(SUS304) thickness

2.0mm

side manhole

330*430mm

Design pressure

0.3MPa

p2148.jpg

Our service:
a.) Free consultation service before, during, and after sales;
b.) Project planning and design services,CAD,3D.The CAD design need 2-3 workdays.The 3D design need 7 days.
c.) Management of equipments' long distance shipping from seller's factory to named port or station by buyer;
d.) Training of equipment maintenance and operating personally;
e.) New production techniques;
f.) Provide 36 months complete warrantee for tanks body and life-time maintenance service; All of the accessories and auxuliaries facilities are guaranteed for one year; The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare parts and wearing parts are attached with the machinery for free.

image007.jpg

Shipping details:

image015_副本.jpg

The manufacture time will be about 40-45 days.

The shipping time is about 35-40days.

If you want to know the shipping cost to your country, pls tell me your nearest port.

Hot Tags: large brewing plant, China, suppliers, manufacturers, factory
Related Products
  • Feedback